October 25, 2012

IKEA Kitchen Install- Phase 1

Jon's Dad came for a visit last week (an all work visit!).  We couldn't pry the level out of his hands, even when trying to tempt him with delicious Mexican food!

HE GOT SO MUCH DONE!


After a lot of planning and measuring, the first cabinet went in Tuesday morning. 


The original sink still hanging in there.


Installation rail hung.


Giant fridge cabinet.


Hanging the first cabinet on the window wall.


The upper cabinet layout on the "stove wall". 


Second "sink wall" cabinet hung.  We hung the upper cabinets on this side extra high in order to maximize the counter space.  


This cabinet was raised to match the right side.


Nice and level!


Trim piece (color of the cabinets) next to the interior cabinet.


View from the back entry.


Stove wall with base cabinets.


Window wall with base cabinets.


The dining room is getting empty!!

No comments: